Twitter Weekly Updates for 2011-07-10

  • Day 9 BR: Masterbed rm most of second sub flooring laid down. Added valve to feed line to toilet. So tired… So sore! #flooringproject2011 #
  • Day 10 BR: slower day… We both are sore…got the rest of the bathroom and bedroom subfloor pieces cut #flooringproject2011 #
  • The sore in my sore body is even sore.I think that when I get back to work next week someone will have my sanity evaluated. #summervacation #

Powered by Twitter Tools

Leave a Reply